|
Support Worker Steve
4hrs 57 minutes sleep Risk level Maximum Weather 16 ° mostly cloudy Toilet attempted at 5.15pm but not interested at all Activities: Very short walk up Cambridge Dr to park and had a go on the swings then headed back ,teeth brushed and into program room to work on his jigsaw puzzle. Progress notes: Sachin was Standing in the kitchen when I arrived today and toilet attempted at 5.15pm but wasn't interested so got him ready for his walk and due to high risk only went to end of Cambridge Dr to park and sat and had a play on the swing which Sachin thoroughly enjoyed then headed back and brushed his teeth and grabbed our teas and headed straight into the program room to get to work on his jigsaw very focussed and enthusiastic to start with hr was at times below 60bpm extra medication given tonight at 5.30pm normal at 6.30.pm then another lot at 7.30pm Sachin then lost interest in his puzzle and was just happy to relax in his chair until it was time to head out to the lounge room and took a little while to settle then sat with his Nan and had a head massage and another cup of tea hr was bouncing around abit between 65bpm and 70 but still very relaxed shift finished at 9pm after extra medication given.
0 Comments
Leave a Reply. |
AuthorSajit Verma. Categories |
Proudly powered by Weebly
RSS Feed