|
Support worker:- James.
Seizure risk level:- Risk level- Minimal Previous night Sleep:- 11:44 hours sleep. Resting heart rate:- 62 resting bpm. ACTIVITIES. Walk Jigsaw puzzle work. Deconstruction of wooden out door setting. WEATHER: 22 degrees, Sunny. Mood: Sachin appeared content and well rested, he showed good focus on his own things and didn’t pay too much attention to me or others, Sachin appeared very much the same as yesterday. NOTES: Sachin was already in the jigsaw room when I arrived. Sachin was encouraged to use the toilet, he didn’t go so Sachin was assisted with brushing his teeth instead. We returned to the jigsaw puzzle with a cup of tea in hand. Sachin had his 1830 medication, dispensed by his father. At 1910 hours Sachin and I went out back yard and started pulling apart the wooden sitting area, the wood will be recycled and made into something else later down the track. Sachin was assisted to use the drill to remove decking screws. At 1940 hours we packed up and went for an evening walk along Tabletop road to the second bridge, 3656 steps in 31 minutes, Shift ceased at 2030 hours.
0 Comments
Leave a Reply. |
AuthorSajit Verma. Categories |
Proudly powered by Weebly
RSS Feed